Generation-backed supply
Dardania AI plans direct agreements with electricity producers, supported by dedicated high-voltage lines and substations. The proposed arrangement aims to serve the campus without redirecting supply intended for households and local businesses.
Diversity and resilience
The supply strategy includes multiple generation sources, including regional renewables. Dedicated transmission infrastructure is designed around 2N redundancy. Diversification is intended to improve reliability and provide greater control over long-term electricity costs.
Supporting new capacity
As demand increases, the company intends to develop additional generation. A committed, long-term customer can help new energy projects secure financing, potentially expanding supply beyond the needs of the campus itself.
Cooling with limited water demand
The design uses a closed-loop liquid-cooling system for NVIDIA Vera Rubin infrastructure. Coolant is recirculated and heat is rejected through dry coolers. This approach avoids evaporative cooling towers and is intended to minimize ongoing municipal water requirements.
Explore the next phase.
Talk about capacity