NVIDIA · Compute Architecture
Designed to the NVIDIA Vera Rubin DSX reference architecture. Compute density, power and liquid-cooling requirements drive the campus design instead of being retrofitted into it.
KOSOVO. CONNECTED TO WHAT’S NEXT.
The next era of AI needs a new foundation.
We’re building it in the heart of the Balkans.
FERIZAJ, KOSOVO 01 / CAMPUS VISION42.5°N · 21.1°E
THE AMBITION
1.2GW
Planned total campus capacity
THE FIRST CHAPTER
300MW
Planned first phase
THE NEXT MILESTONE
2027
Target: first 50 MW in service
01 THE VISION
A NEW PERSPECTIVE ON INFRASTRUCTURE
Land. Power. Compute.
One connected vision.
From the first foundation to the next generation of AI, Dardania brings the essential layers of infrastructure together in one place.
Discover the platformA campus planned around tomorrow’s ambition.
Direct energy contracts at the foundation.
Liquid cooling designed in from the beginning.
The platform is built around control of power, not just access to it. Engineered for high-density hyperscaler, enterprise and sovereign workloads. Compliant with EU data residency and GDPR requirements.
Land secured near Camp Bondsteel, with access to the transmission corridor. Master-planned for a 1.2 GW campus.
A dedicated, directly contracted power supply. Dardania AI controls the energy stack end to end.
Every data hall is built for direct-to-chip liquid cooling from the start, on the NVIDIA reference architecture. Nothing is adapted from an air-cooled design.
Multiple operators provide dedicated, redundant fiber backbone.
Power deliverability is now the binding constraint on AI infrastructure. Dardania AI is built for hyperscalers, sovereigns and enterprises that cannot wait years for capacity to come online.
A dedicated, directly contracted power supply protects the national grid and shields customers from rising tariffs and carbon taxes.
A scalable AI Factory engineered for hyperscaler, enterprise and sovereign demand, delivered in repeatable 50 MW increments to a 300 MW baseline, then on to 1.2 GW.
Energized megawatts without the multi-year wait for Western European capacity.
A GDPR- and EU data-residency-compliant framework, adjacent to the largest U.S. military base in the Balkans.
Liquid-cooled, NVIDIA reference-architecture capacity on direct-contracted power.
02 THE CAMPUS
FERIZAJ, KOSOVO
Explore the planned journey
from 300 MW to 1.2 GW.
CAMPUS GROWTH / ILLUSTRATIVEFirst 50 MW targeted for December 2027. Phase 1 is planned to reach 300 MW through 2028.
Planned capacity · Dates are project targets03 THE PLATFORM
DESIGNED AS ONE SYSTEM
Great infrastructure begins with the connections between its parts.
NVIDIA reference architecture shapes the design for high-density GPU workloads.
Vertiv power and cooling infrastructure supports modular deployment and direct-to-chip liquid cooling.
Black & White Engineering brings campus design and infrastructure workstreams together.
TECHNOLOGY & ENGINEERING

Designed to the NVIDIA Vera Rubin DSX reference architecture. Compute density, power and liquid-cooling requirements drive the campus design instead of being retrofitted into it.

Prefabricated power, cooling and data hall blocks, added in 50 MW increments. Direct-to-chip liquid cooling with dry coolers for heat rejection.

A data-center-only engineering consultancy, 500+ engineers in 23 countries, leading design and integrating the power, cooling and construction workstreams.
04 ON THE GROUND
THE VISION IS TAKING SHAPE
NEWS & INSIGHTS

Technology, engineering and finance partners gathered to align on the Phase 1 build.
Read
Site works begin on the 1.2 GW campus, with 300 MW in Phase 1.
ReadPlanning AI capacity in EMEA for 2027 and beyond? Let’s connect in Berlin.
Read
The strategic advantage of speed to market, NATO-grade security, and Western alignment.
Read
How Dardania AI is building an independent energy model for AI infrastructure.
ReadFILM FROM THE SITE
ORIGINAL CAMPUS FOOTAGE
Drone footage over the Dardania AI campus in Ferizaj.
Open videoExcavation on the 300 MW pad · October 2026.
Open video
300 MW Slab · September 2026

August 2026


300 MW Slab · September 2026

05 THE PEOPLE
EXPERIENCE BEHIND THE AMBITION
A meeting of technology,
investment and execution.
Dardania AI brings together Silicon Valley expertise and institutional investment discipline to build and operate gigawatt-scale AI infrastructure across EMEA.
Backed by Dardania Capital, the team combines deep experience in technology, AI infrastructure and operational value creation with over 20 years of experience operating in Kosovo.

Chief Executive Officer
Technology entrepreneur and investor with more than 20 years building and scaling AI-focused ventures, with deep expertise in operational value creation, M&A and structured capital.

President
Operator and investor with more than 30 years of experience, including as a senior executive and founder at public companies, with $3.5B+ in capital financings and $5.6B+ in completed M&A.

Partnerships & Government
More than 30 years in enterprise SaaS, analytics and AI, including senior leadership roles at Oracle, Hyperion and Appen. Founded and exited OpsPanda and Heavy.AI.

Infrastructure
Led one of Google’s fastest-growing global business units and earlier ran a $500M+ business unit at SAP, with senior roles at Adobe. Board operating director at QScale, focused on go-to-market and AI data center growth.

Technology
More than 20 years leading cloud, cybersecurity and data center infrastructure, and building mission-critical environments for enterprises and service providers.

Platform Execution
Experienced technology and operating executive with a background spanning enterprise software, AI, IoT, and private equity. Previously held senior roles at Sumeru Equity Partners, C3 AI, Bain & Company, and GE.

Capital Strategy
Co-founder and Managing Director of Hercules Capital, with more than 30 years in venture debt and structured growth financing across technology and infrastructure. Previously CFO and VP of Finance at technology companies.

Energy Development
More than 30 years in energy, including as Chief Operating Officer of California Resources Corp., California’s largest oil producer, where he ran $2B capital budgets and 800 staff.

EU Corporate Counsel
Expert in energy sector matters, with more than 20 years in C-level and general counsel roles across energy, infrastructure, mining, and oil and gas. Led projects financed by EU institutions, the World Bank and private investors (EU, UK, Canada).

Strategy & Corporate Development
Served in senior finance, operations, and M&A roles at technology companies. Completed multiple $100M+ M&A transactions. Previously William Blair, Sumeru Equity Partners and 3Gtms, through its sale to Descartes.
YOUR NEXT CHAPTER STARTS HERE
Start a conversation about your AI infrastructure.
jon@dardania.ai